asieps_tobira_IM_US.book 42 ページ 2012年1月17日 火曜日 午後3時48分
CONTROL SYSTEMS
NOTE:
• Install the lock wire to the stay groove.
• Bend the extra wire to the same direction of lock
wire winding.
(A)
B
(B)
B - B
(A) Inner boot
(B) Lock wire
(C) Stay
11) Check the swing torque of rod linked with the
gear shift lever.
12) Check that the part moves smoothly, with no
excessive play.
2. 6MT
NOTE:
• Clean all the parts before assembly.
• Apply NIGTIGHT LYW NO. 2 grease or the
equivalent to each part.
1) Mount the bushing and cushion rubber to the stay.
(B)
(A)
(A) Bushing
(B) Stay
(C) Cushion rubber
MT Gear Shift Lever
2) Install the bushing and spacer to boss.
(A)
B
(B)
(C)
3) Install the snap ring to gear shift lever and install
the bushing.
NOTE:
Apply grease to the bushing.
(B)
CS-00240
4) Apply grease to the bushing and O-ring, and
then install to gear shift lever.
(C)
CS-00239
CS-42
(B)
(A)
(A) Bushing
(B) Spacer
(B)
(A)
(A) Bushing
(B) Snap ring
(A)
(B)
(A)
(A) O-ring
(B) Bushing
(A)
CS-00238
CS-00237
CS-00236