GE Senographe DS Manual page 1748

Hide thumbs Also See for Senographe DS:
Table of Contents

Advertisement

GE Healthcare
Revision 1
Job Card CHK A011 - Check kVp settings
7
PROCEDURE - RMI 232 KVP METER
7-1
kVp meter calibration
1. Note the meter identification number and date of most recent calibration:
2. Note the required kV correction values by copying CP row values from the meter calibration curve.
7-2
Position the meter
1. Ensure that the Radiation Protection Plate is 205 mm (8.07 inches) below the bottom of the Tube
Head.
2. Place the kV peak meter on the Radiation Protection Plate located on the Standard 19 x 23 Com-
pression Paddle.
3. Use the Senographe light centering device to center the kV peak meter target within the X-ray zone.
Chapter 9
kVp meter
identification number
Date of calibration:
(dd/mm/yy)
Measured kVp
kV Correction
value
Service Information and Procedures Class A 2385072-16-8EN
26
28
Page no. 1748
30
32
Senographe DS
JC-CHK-A-011.fm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents