Job Card Pm A205 - Mechanical Checks And Lubrication - GE Senographe DS Manual

Hide thumbs Also See for Senographe DS:
Table of Contents

Advertisement

GE Healthcare
Revision 1

Job Card PM A205 - Mechanical checks and lubrication

1
SUPPLIES
Lubricant
Grease (for Lift and Rotation)
2
TOOLS
Standard Tool Box
3
REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 20 minutes
4
SAFETY PRECAUTIONS
WARNING
Before working on any Gantry mechanism, shut down the equipment and switch OFF the
Senographe hospital supply circuit breaker. Lock it in the OFF position or mark it clearly
with a warning sign to prevent others from applying power.
NEVER switch off at the UPS except in emergency (risk of data loss).
5
PREREQUISITES
The Gantry Column and Compression Arm covers must be removed. Refer to
Remove/Reinstall Gantry Covers on page
Release the four hex head screws securing the lower X plate (10 mm open-ended wrench).
JC-PM-A-205.fm
Service Information and Procedures Class A 2385072-16-8EN
Job Card PM A205 - Mechanical checks and lubrication
523.
Page no. 1779
Senographe DS
Chapter 11
Job Card PHY A044 -
Chapter 11

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Senographe DS and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF