GE Healthcare
Revision 1
Job Card PM A300 - 21-inch 3MP Monitor Luminance Checks
7-2
Perform Luminance Tests
1. Ensure that the 21-inch 3MP Monitor has been powered on for at least 30 minutes. The 30 minute
warm up period is necessary before performing the luminance tests.
2. From the Patient List in the Browser, select the AAPM Test Patterns Patient.
AAPM Test Patterns
3. In the Study list, select the 1K-LUMIN Study ID.
4. In the Series list, select Series 2 (Procedure Description TG18-LN).
5. Click the Review Exam
6. If not already selected, use the Img up/down buttons to select the first image (number 1) in the
series. Ensure that the title of the displayed image is TG18-LN12-01 Pattern.
Chapter 11
Service Information and Procedures Class A 2385072-16-8EN
icon. The Exam Review window appears with images from the series.
Page no. 1796
Senographe DS
Lumiance Meter
Position
JC-PM-A-300.fm