Shafts And Clutches; Mainshaft Disassembly, Inspection, And Reassembly - Honda Accord 2008 Manual

Hide thumbs Also See for Accord 2008:
Table of Contents

Advertisement

07/11/02 09:22:48 61TA0000_140_0345

Shafts and Clutches

Mainshaft Disassembly, Inspection, and Reassembly

1. Inspect the thrust needle bearings and the needle bearings for galling and rough movement.
*01
2. Inspect the splines for excessive wear and damage.
3. Check the shaft bearing surface for scoring and excessive wear.
4. Before installing the O-rings, wrap the shaft splines with tape to prevent the O-ring damage.
5. Lubricate all parts with ATF during assembly.
6. Install the conical spring washer and the 41 x 68 mm thrust washer in the direction shown.
7. Replace the locknut and the conical spring washer with new ones when assembling the transmission.
8. Check the clearance of 5th gear (see page 14-344).
TA08AEBE10411200000MEAT00
THRUST NEEDLE BEARING
4TH GEAR
NEEDLE BEARING
THRUST NEEDLE BEARING
4TH GEAR COLLAR
4TH/5TH CLUTCH
O-RINGS
Replace.
MAINSHAFT
SEALING RINGS,
29 mm
NEEDLE BEARING
SET RING
LOCKNUT (FLANGE NUT)
24 x 1.25 mm
226 N·m (23.0 kgf·m, 166 lbf·ft)
167 N·m (17.0 kgf·m, 123 lbf·ft)
Replace.
THRUST WASHER, 41 x 68 mm
Selective part
THRUST NEEDLE BEARING
NEEDLE BEARING
5TH GEAR
THRUST NEEDLE BEARING
0
CONICAL SPRING
WASHER
Replace.
IDLER GEAR
TRANSMISSION
HOUSING BEARING
14-343

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents