3.11

Test Run Checklist

Go through the following checklist before performing a test run.
Checke
No.
d
1
Was this manual read thoroughly before starting a test run?
2
Was the "Wiring Checklist" gone through?
3
Is the drive energized?
4
Has the voltage value of the power supply to be used been set to E1-01 [Input AC Supply Voltage]?
Check the necessary items depending on the control method.
WARNING! Sudden Movement Hazard. Properly wire the start/stop and safety circuits before energizing the drive. When
programmed for 3-Wire control, a momentary closure on a digital input terminal could cause the drive to start. Failure to comply
could cause death or serious injury from moving equipment.
Table 3.24 V/f Control [A1-02 = 0] and Closed Loop V/f Control [A1-02 = 1]
Checke
No.
d
Was the optimum V/f pattern selected, based on the application that the motor is to be used for, and its
specifications?
5
Ex.: if a motor with a rated frequency of 60 Hz is to be used, as a standard V/f pattern, E1-03 = 1 [V/f Pattern
Selection = Constant Trq_60Hz base_60Hz max] is set.
Checke
No.
d
6
Has F1-01 [PG 1 Pulses Per Revolution] been set?
7
Have C5-01 [ASR Proportional Gain 1] and C5-02 [ASR Integral Time 1] been set?
Table 3.26 Open Loop Vector Control [A1-02 = 2]/Closed Loop Vector Control [A1-02 = 3]
Checke
No.
d
8
Was Rotational Auto-Tuning performed?
9
Were the motor shaft and machinery decoupled when performing Rotational Auto-Tuning?
Were the following items, which can be found on the motor nameplate, set correctly?
• Motor rated power (kW) → T1-02
• Rated (base) voltage (V) → T1-03
10
• Rated (base) current (A) → T1-04
• Rated (base) frequency (Hz) → T1-05
• Number of poles → T1-06
• Rated (base) speed (min
Checke
No.
d
11
Have F1-01 [PG 1 Pulses Per Revolution] and F1-05 [PG 1 Rotation Selection] been set?
12
Have C5-01 [ASR Proportional Gain 1] and C5-02 [ASR Integral Time 1] been set?
Checke
No.
d
13
Have E5-01 to E5-24 [PM Motor Parameters] been set?
YASKAWA ELECTRIC SIEP C710617 01B YASKAWA AC Drive GA700 Technical Manual
Table 3.25 Closed Loop V/f Control [A1-02 = 1]
-1
) → T1-07
Table 3.27 Closed Loop Vector Control [A1-02 = 3]
Table 3.28 PM Open Loop Vector Control [A1-02 = 5]
Description
Description
Description
Description
Description
Description

3.11 Test Run Checklist

173
3

Advertisement

Table of Contents
loading

Table of Contents