YASKAWA GA700 Technical Manual page 771

High performance type; 200 v class: 0.4 to 110 kw; 400 v class: 0.4 to 355 kw
Hide thumbs Also See for GA700:
Table of Contents

Advertisement

OFF : Normal operation
When KEB Ride-Thru 1 is enabled, set L2-29 [KEB Method Selection]. The drive operates with the KEB method
that was selected.
Note:
• If KEB Ride-Thru 1 [H1-xx = 65, 66] and KEB Ride-Thru 2 [H1-xx = 7A, 7B] are set simultaneously, oPE03 [Multi-Function Input
Setting Err] is detected.
• Refer to "KEB Ride-Thru function" for details.
67: Communications test mode
Setting
Function
67
Communications test
mode
Self-Diagnostics function connects the transmission terminal of the control terminal block with the reception
terminal and transmits the data that the drive has sent, checking whether the drive is able to communicate
normally.
Note:
Refer to MEMOBUS/Modbus communications "Self-Diagnostics" for the self-diagnostics procedure.
68: High Slip Braking (HSB)
Setting
Function
68
High Slip Braking
(HSB)
Note:
• When restarting the drive after performing high-slip braking, ensure that the drive completely stops the motor and clear the high-slip
braking input.
• Refer to "n3: High Slip/Overex Braking" for details.
6A: Drive Enable
Setting
Function
6A
Drive Enable
When the Run command is input in the drive prior to turning On the terminal assigned for Drive Enable, the drive
will not operate until the Run command is re-input. When the drive is operating, if the terminal that is assigned for
Drive Enable has been turned OFF, the drive stops the motor using the method set in b1-03 [Stopping Method
Selection].
ON : Run command is accepted.
OFF : Run command is disabled. When the drive is running, it stops according to b1-03 setting.
71: Speed/Torque Control Switch
Setting
Function
71
Speed/Torque Control
Switch
ON : Torque control
OFF : Speed control
Note:
Set d5-01 = 0 [Torque Control Selection = Speed Control] when this function is enabled.
Input the Speed/Torque Control Switchover Time
The user can set the time it takes for control to switchover after the speed/torque control switchover signal is input
in d5-06 [Speed/Torque Changeover Time] using units of milliseconds. The three analog inputs hold at the values
present at the time the speed/torque control switchover signal is changed within the time of d5-06. Complete the
signal switchover with an external source within this time.
YASKAWA ELECTRIC SIEP C710617 01B YASKAWA AC Drive GA700 Technical Manual
V/f
CL-V/f
OLV
CLV
AOLV
Performs self-diagnosis on the RS-485 serial communications operation.
V/f
CL-V/f
OLV
CLV
AOLV
Stops the motor using high-slip braking.
V/f
CL-V/f
OLV
CLV
AOLV
The keypad displays dnE [Drive Enabled] when the terminal is turned OFF and the Run command
will not be accepted.
V/f
CL-V/f
OLV
CLV
Switches between torque and speed control.
11.8 H: Terminal Functions
Description
OLV/PM AOLV/PM CLV/PM EZOLV
OLV/PM
Description
OLV/PM AOLV/PM CLV/PM EZOLV
OLV/PM
Description
OLV/PM AOLV/PM CLV/PM EZOLV
OLV/PM
Description
AOLV
OLV/PM AOLV/PM CLV/PM EZOLV
OLV/PM
11
771

Advertisement

Table of Contents
loading

Table of Contents