Maintenance-Object Repair Procedures
Modem Pool Audit Test (#99)
This audit updates the Modem Pool conversion resource status contained in the
TN758 Pooled Modem circuit pack's microprocessor. It does not actually test the
Pooled Modem circuit pack; therefore, there are no FAIL codes. The audit can
only be performed on idle conversion resources. If the conversion resource is in
use, the audit will abort.
Table 8-470. Test #99 Modem Pool Audit Test
Error
Test
Code
Result
Description / Recommendation
None
ABORT
The system was not able to allocate every necessary resource to execute this
test. An ABORT simply indicates that the conversion resource was in use
when the audit was performed. No repair action is necessary unless the
conversion resource was known to be idle during the test (amber in-use LED
was off) or was busied out before the test was run. In that case, a TN758
failure condition may exist and the following procedure should be used:
1. Busyout both of the TN758 Pooled Modem conversion resources on the
2. If the test continues to abort, replace the Pooled Modem circuit pack and
8-1146
Issue 1 May 2002
circuit pack containing the failing conversion resource.
retest.
Continued on next page