Avaya S8700 Maintenance Manual page 1627

For multi-connect configurations
Hide thumbs Also See for S8700:
Table of Contents

Advertisement

HYB-LINE (Hybrid Line)
Error Log Entries and Test to Clear Values
Table 8-348. Hybrid Line Error Log Entries
Error
Aux
Type
Data
Associated Test
1
0
0
Any
1(a)
40987
None
15(j)
Any
Hybrid Line Audits test
(#161)
18(b)
0
busyout port
UUCSSpp
130(c)
None
257(d)
40988
None
513(e)
40965
Hybrid Line Audits test
(#61)
769(f)
Remote Dig
Looparound test (#59)
1025
Hybrid & Conf. Circuits
test (#57)
1281(f)
Local Digital
Looparound test (#58)
1537(g)
40968
None
1793
TDM NPE Crosstalk
test (#6)
2049(h)
32770
None
2049(i)
40967
None
1.
Run the short test sequence first. If every test passes, run the long test sequence. Refer to each appropriate
test's description, and follow its recommended procedures.
2.
Major or minor alarms may be downgraded to Warning alarms based on the value used in the set options
command.
Notes:
a. The data link between the port and the terminal is not operational. (An
off-board problem was detected by port circuit). Verify that the Hybrid set is
connected and that the Electronic Power Feed (EPF) test passes. If data
transmission problems are experienced, check for defective wiring or a
defective voice terminal, or move terminal closer to the switch (reduce the
length of the wiring between the terminal and the switch). If the problem
persists, replace the circuit pack. Once the problem has been resolved,
the alarm will be retired after a predetermined delay.
555-233-143
Alarm
On/Off
Level
Board
Any
Any
WARNING
OFF
WARNING
OFF
WARNING
ON
MINOR
OFF
WARNING
WARNING
OFF
WARNING
OFF
MINOR
ON
WARNING
WARNING
ON
WARNING
OFF
MINOR
ON
2
WARNING
Issue 1 May 2002
Test to Clear Value
test port UUCSSpp sh r 1
release port UUCSSpp
test port UUCSSpp sh
test port UUCSSpp sh r 4
test port UUCSSpp sh r 3
test port UUCSSpp l r 3
test port UUCSSpp l r 3
test port UUCSSpp l r 3
8-905

Advertisement

Table of Contents
loading

Table of Contents