MAINT (PN's Maintenance Circuit Pack)
PN Maintenance Circuit Pack Reset Test (#306)
This test is destructive.
The terminal connection will be dropped and, if the Emergency Transfer switch is
in the AUTO position, Emergency Transfer will be disabled for the duration of the
test.
The PN's Maintenance circuit pack is reset by the active Expansion Interface
circuit pack. After the Expansion Interface circuit pack reports that the PN's
Maintenance circuit pack has reset, a handshake message is sent to the
Maintenance circuit pack. If the Maintenance circuit pack responds to the
handshake, the test passes. If not, it fails. If the test passes, the PN-connected
terminal is brought back up, and Emergency Transfer is restored to its previous
state.
Table 8-410. Test #306 PN Maintenance Circuit Pack Reset Test
Error
Test
Code
Result
Description / Recommendation
1000
ABORT
System resources required to run this test are not available.
1. Retry the command at 1-minute intervals up to 5 times.
1018
ABORT
Test disabled via software patch.
2029
ABORT
Internal system error.
1. Retry the command at 1-minute intervals up to 5 times.
2500
ABORT
Internal system error.
1. Retry the command at 1-minute intervals up to 5 times.
1204
FAIL
1205
EI circuit pack could not reset the PN's Maintenance circuit pack. For duplicated
Port Network Connectivity:
1. The standby EI circuit pack may be defective and, thereby, preventing the
2. The active EI circuit pack may be defective and unable to reset the PN's
555-233-143
active EI circuit pack from resetting the PN's Maintenance circuit pack.
Unplug the standby EI circuit pack, and attempt to reset the Maintenance
circuit pack using the test maint long command. If Test #306 passes,
replace the standby EI circuit pack, and attempt the reset test again. If Test
#306 fails, then replace the standby PN EI circuit pack.
Maintenance circuit pack. Interchange the PNC by entering the reset pnc
interchange command. Now reset the Maintenance circuit pack again by
using the test maintenance long command. If the test passes, the problem
is with the known standby EI circuit pack. Repeat Step 2 to determine
whether the standby EI circuit pack should be replaced.