Avaya DEFINITY Server CSI Maintenance Manual page 479

Table of Contents

Advertisement

status hardware-group
Field descriptions
Hardware Group Command
State:
Number of MOs Tested:
Total Number of MOs to be
Tested:
Percent Complete:
Elapsed Test Time:
Repetition Number
Percentage of Tests
Passed:
Percentage of Tests
Failed:
Percentage of Tests
Aborted:
Command:
Test sequence:
Test repetition:
Output options:
Hardware options:
555-233-119
"active" = testing in progress, "canceled" = testing canceled,
"complete" = command completed; no testing occurring.
Number of MOs in the specified group (refer to test
hardware-group command) that the hardware-group
command tests, including MOs that were tested or aborted
due to resource contention.
Number of MOs in the group specified in the test
hardware-group command.
Ratio of the completed MOs to the MOs to test in the
command.
Tracks completion time for the hardware-group command. If
a test cancels and then restarts, the time for the cancel period
is excluded. (HH:MM:SS)
Number of completed iterations that correspond to the "repeat"
or "continuously" option.
Percentage of tests that passed.
Percentage of tests that failed.
Percentage of aborted tests
Hardware-group action objects and qualifiers.
Short or long.
Displays continuously or the keyword repeats with the entered
repeat value.
Selections that were chosen on the input form: auto-page,
background, or failures.
Selections that were chosen on the input form: all-ports, or
SPE-interchange.
Issue 5 October 2002
479

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DEFINITY Server CSI and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF