Avaya DEFINITY Server CSI Maintenance Manual page 566

Table of Contents

Advertisement

Maintenance Commands
Feature Interactions
The maintenance of a particular component on a link sometimes interferes with
the maintenance of the link itself. Maintenance can put a link component in a busy
state causing link set-up to fail. Frequent attempts at re-setup of a link may delay
the recovery of a faulty component due to the maintenance test of a component
only taking place when the component is idle. Therefore, the technician needs to
be able to disable the attempted re-setup of a link. Use of the busyout command
causes the link to be torn down. If the link is already down, the busyout command
will stop periodic re-setup trys on the link.
Output
The following example shows the output for test journal-printer pms-log. The
responses appear on a test-by-test basis with one line of data for each test result.
test journal-printer pms-log short
Port
Maintenance Name
JRNL-LINK
Field descriptions
Port
Maintenance
Name
Alt. Name
Test No
Result
Error Code
566
Issue 5 October 2002
TEST RESULTS
Alt. Name Test No. Result
Not applicable (always blank)
The name of maintenance object being tested:
PMS-PRINT for testing the pms-log printer link
JNL-PRNT for testing the wakeup-log printer link
Not applicable (always blank)
The test being executed
Test result: Pass, Abort, Fail, Disabled
Numeric code explaining why the release failed or aborted. See
the detailed list of the codes by test number for each MO.
215
PASS
Error Code
555-233-119

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents