Avaya DEFINITY Server CSI Maintenance Manual page 577

Table of Contents

Advertisement

test pms-link
Feature Interactions
The maintenance of a particular component on a link may interfere with the
maintenance of the link itself. Maintenance can put a link component in a busy
state causing link set-up to fail. Frequent attempts at re-setup of a link may delay
the recovery of a faulty component due to the maintenance test of a component
only taking place when the component is idle. Therefore, the technician needs to
be able to disable the attempted re-setup of a link. The busyout command is
used to do this and causes the link to be torn down. If the link is already down,
busyout stops periodic re-setup tries on the link.
Output
The following example shows the output from test pms-link l. The responses
appear on a test-by-test basis with one line of data for each test result.
test pms-link long
Port
Maintenance Name
PMS-LINK
Field descriptions
Port
Maintenance
Name
Alt. Name
Test No
Result
Error Code
555-233-119
TEST RESULTS
Alt. Name Test No. Result
Always blank
Always PMS-LINK
Not applicable.
The test being executed
Test result: Pass, Abort, Fail, No Board, Disabled, Extra Bd.
Numeric code explaining why the release failed or aborted. See
the detailed list of the codes by test number for each MO.
214
PASS
Issue 5 October 2002
Error Code
577

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DEFINITY Server CSI and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents

Save PDF