Avaya DEFINITY Server CSI Maintenance Manual page 1900

Table of Contents

Advertisement

Maintenance Objects
Notes:
a. This port has been busied out with the busyout port PCSSpp command.
b. The circuit pack has been removed or has been insane for more than 11
minutes. To clear the error, replace or reinsert the circuit pack.
c. The NPE Crosstalk Test(#1103) failed.
d. The VC Summer Port Local TDM Loopback Test(#1100) failed.
System Technician-Demanded Tests: Descriptions
and Error Codes
Always investigate tests in the order presented in the table below. By clearing
error codes associated with the
clear errors generated from other tests in the testing sequence.
Order of Investigation
NPE Crosstalk Test (#6) (a)
TDM Loopback Test (#1100)
1.
D = Destructive; ND = Nondestructive
NPE Crosstalk Test (#6)
This test is destructive.
The NPE Crosstalk test verifies that this port's NPE channel talks on the selected
time slot and never crosses over to time slots reserved for other connections. If
the NPE is not working correctly, one-way and noisy connections may be
observed. This test is part of the port's long test sequence and takes
approximately 20 to 30 seconds to complete.
1900
Issue 5 October 2002
, for example, you may also
TDM Loopback Test
Short Test
Long Test
Sequence
Sequence
X
1
D/ND
X
D
X
D

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents