8 On The Sorting/Grouping tab of the Schedule Properties dialog, do the following:
a For Sort by, select the following:
Comments
Ascending
Footer
Title, count, and totals
Blank line
b For Then by, select both Usage and Ascending.
c At the bottom of the dialog, select the following:
Grand totals
Title and totals
Itemize every instance
9 Click the Formatting tab, and do the following:
a Under Fields, select Exterior Surface Area.
b For Alignment, select Right.
c Select Calculate totals.
d Specify formatting for Exterior Surface Area %: under Fields, select Exterior Surface Area %.
For Alignment, select Right. Select Calculate totals.
e (Optional) Specify formatting for Comments, Usage, Level, and Mass: Type: under Fields,
select a field name. Then for Alignment, select Center.
10 Click OK twice.
The schedule updates to sort and subtotal the rows accordingly. It shows the percentage of surface area for
each exterior material, as well as square units.
In this example, the exterior surface areas for some mass floors (such as Square Level 4 and Wedge Level 6)
are larger than those for other mass floors because they are calculated differently. See
of a Mass
on page 524.
Also, where the masses are joined, the inner surfaces between masses are deducted from the exterior surface
area. See
Overlapping Mass Faces
on page 521.
Examples of Conceptual Design Analysis | 535
Mass Floors at the Top

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 24000-000000-9860 - Revit Architecture - PC and is the answer not in the manual?

Table of Contents

Save PDF