6 For each sheet in the list, click in the Sheet Order column, and enter a number to indicate its
7 To hide the Sheet Order field, right-click the column in the drawing list, and click Hide
You can place the drawing list on a sheet and format it as desired. See
1002 and
Formatting a Schedule on a Sheet
Revisions
When working on building projects, you must often make changes to meet client or regulatory requirements.
These revisions need to be tracked for future reference. For example, you may want to check the revision
history to identify when, why, and by whom a change was made. Revit Architecture provides tools that
enable you to track revisions and include revision information on sheets in a construction document set.
1008 | Chapter 15 Preparing Construction Documents
d On the Element Properties dialog, click OK.
The drawing list displays a column titled Sheet Order. In a later step, you will hide this column
so it does not display in the drawing list. First, however, you must assign a sheet order to each
sheet in the list.
order in the sheet sequence.
As you enter sheet order numbers, Revit Architecture re-sorts the list to place the rows in order.
Column(s).
Revit Architecture hides the Sheet Order column in the drawing list.
NOTE To redisplay the Sheet Order column, right-click in the drawing list, and click Unhide All
Columns.
on page 1002.
Adding a Schedule to a Sheet
on page