Applying A Phase To A Schedule; Modifying Schedules; Editing Cells In A Schedule - Autodesk 24000-000000-9860 - Revit Architecture - PC User Manual

User guide
Table of Contents

Advertisement

Schedule with an Outline and Underlines

Applying a Phase to a Schedule

1 In the Project Browser, right-click the schedule name, and click Properties.
2 In the Element Properties dialog, enter values for the Phase Filter and Phase parameters.
3 Click OK.
For more information on phases, see

Modifying Schedules

There are various ways to modify schedules to improve the readability and to keep them up to date with
changes in your project.
Schedule Updates
All schedules update automatically when you modify the project. For example, if you move a wall, the square
footage updates in a room schedule accordingly.
When you change the properties of building components in the project, the associated schedule updates
automatically. For example, you could select a door in the project and change the manufacturer property
of it. The door schedule would reflect the change to the manufacturer property.

Editing Cells in a Schedule

You can edit the cells in a schedule by clicking in them. You can either select a value from a list (if available)
or enter text. As you add new values, they become available in that field's list.
Project Phasing
on page 1263.
Applying a Phase to a Schedule | 141

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 24000-000000-9860 - Revit Architecture - PC and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF