Formatting Schedules
You have several choices available for formatting the look of the schedule. You can
Specify the order and type of properties to display
Create totals
Create your own custom properties, which you can then include in the schedule
Apply phases to a schedule
Schedule Tips
Mouse-wheel scrolling is available in schedule views. Move the mouse wheel to scroll vertically. Hold
SHIFT and move the wheel to scroll horizontally.
You can select an element in a non-schedule view by clicking in a cell in a schedule. This works best if
you are tiling windows. To change the non-schedule view to see the element more clearly, in the schedule
view, on the Options Bar, click Show. After you click the Show button, the Show Elements in View dialog
displays. You can continue to click Show in this dialog to open other views that show the element.
Creating a Schedule or Quantity
1 Click View menu
2 In the New Schedule dialog, select a component from the category list. A default name appears
3 Select Schedule building components.
4 Specify the phase.
5 Click OK.
6 In the Schedule Properties dialog, specify the schedule properties. See
7 Click OK.
Key Schedules
Schedules, particularly for windows, doors, or rooms, can comprise multiple items that have the same
characteristics. For example, a room schedule might have 100 rooms with the same floor, ceiling, and base
finishes. Rather than enter all this information manually for all 100 rooms in the schedule, you can define
keys that automatically fill in information. If a room has a defined key, then as that room is added to a
schedule, fields in the schedule automatically update, reducing the time required to produce the schedule.
You define keys using key schedules. Key schedules look very similar to component schedules, except you
define them to your specifications. When you create a key, it is listed as an instance property for the element.
When you apply a value for the key, then the key's attributes are applied to the element.
New
Schedule/Quantities.
in the Name text box, which you can change as necessary.
NOTE Do not select Schedule keys. If you want to create a key schedule, see
125.
Properties
on page 128.
Schedule/Quantities, or on the View tab of the Design Bar, click
Key Schedules
Specifying Schedule