Avaya S8700 Maintenance Manual page 1979

For multi-connect configurations
Hide thumbs Also See for S8700:
Table of Contents

Advertisement

PKT-INT (Packet Interface)
Table 8-509. Test #884 Memory Checksum Test — Continued
Error
Test
Code
Result
Description / Recommendation
1
FAIL
The Boot PROM memory checksum test failed. The circuit pack may still be
operational.
1. Retry the command.
2. The same error code occurs:
2
FAIL
The Flash memory checksum test failed. The circuit pack may still be
operational, but will fail if a reset is executed.
1. Retry the command.
2. If the same error code occurs:
3
FAIL
The Boot PROM memory Checksum test and the FLash memory checksum
test have both failed. Follow the steps listed for FAIL Error Codes 1 and 2.
PASS
The circuit pack's firmware is in a proper state. If problems are still reported on
the circuit pack, check for errors on the Private Loop-around test (#885) and
Maintenance Loop-Around test (#886).
555-233-143
a. If this is a duplex-reliability system, replace the circuit pack at a time
that would cause the least disruption of service. The circuit pack is still
functional but should be replaced since it may not operate after a
system reboot and it will enter a fatal fault state if it is reset for other
reasons.
b. If this is a high- or critical-reliability system and if the Packet Interface is
on the standby IPSI, replace that circuit pack.
c. If this is a high- or critical-reliability system and if the Packet Interface
circuit is on the active IPSI, enter set ipserver-interface to perform a
planned IPSI interchange.
a. If this is a duplex-reliability system, replace the circuit pack at a time
that would cause the least disruption of service. The circuit pack is still
functional but should be replaced since it may not operate after a
system reboot and it will enter a fatal fault state if it is reset for other
reasons.
b. If this is a high- or critical-reliability system and if the Packet Interface
circuit is on the standby IPSI, replace that circuit pack.
c. If this is a high- or critical-reliability system and if the Packet Interface
circuit is on the active IPSI, enter set ipserver-interface to perform a
planned IPSI interchange.
Continued on next page
Issue 1 May 2002
8-1257

Advertisement

Table of Contents
loading

Table of Contents