Maintenance Commands
Status bri-port interpretation
Table 23
provides information on the status bri-port form.
Table 23. Status BRI-Port Command Interpretation
Endpoint
TEI
Layer 2
Types
Range
State
ASAI,
0-126
Assigned
BRI
ASAI
0-63
Established
430
Issue 5 October 2002
Voice
Service
Extension
SPID
Description / Recommendation
blank
blank
Transitory state for BRI endpoints and
ASAI adjuncts. The switch attempts
link establishment.
blank
blank
Transitory state for ASAI adjuncts.
ASAI signaling is connects at Layer 2.
Layer 3 Restart procedure does not
complete between switch and adjunct.
1. Check endpoints and wiring by
following SPID Facility Test
Procedures described in the
BRI-SET (ISDN-BRI Set/ASAI
Adjunct) Maintenance
documentation.
2. Verify repairs with status bri-port
PCSSpp. Determine that L2 state
of the signaling link is
"L3-Established" for ASAI adjuncts
and BRI endpoints supporting
MIM (management information
messages) initialization and
"Established" for fixed TEIBRI
endpoints and automatic TEIBRI
endpoints not supporting MIM
initialization.
NOTE:
A MIM is a level-3 message that
conveys management and
maintenance information
between communications
systems and BRI terminals.
1. Check the adjunct by following the
manufacturer's recommended
repair procedures.
2. Verify repairs by executing the
status bri-port PCSSpp
command. Determine that the L2
state of the signaling link is
L3-Established.
Continued on next page
555-233-119
Need help?
Do you have a question about the DEFINITY Server CSI and is the answer not in the manual?