Toyota Celica 2005 Repair Manual page 1856

Hide thumbs Also See for Celica 2005:
Table of Contents

Advertisement

3
1
Secondary Locking Device
2005 CELICA (RM1131U)
AUTOMATIC TRANSAXLE (U240E)
DISASSEMBLY
1.
(a)
(b)
5
6
(c)
2
D05928
2.
(a)
NOTICE:
Pay attention not to apply unnatural load to O/D main
switch wire harness.
(b)
(c)
D05929
(d)
D05930
3.
(a)
(b)
(c)
D05931
4.
(a)
(b)
(c)
(d)
(e)
D05932
FLOOR SHIFT ASSEMBLY
REMOVE O/D MAIN SWITCH TERMINAL
Remove the O/D main switch connector from the shift le-
ver plate.
Disengage the secondary locking device.
Release the locking log of the terminals 5 and 6, and pull
the terminals out from the rearward.
REMOVE SHIFT LEVER KNOB SUB−ASSEMBLY
Remove the 2 screws and shift lever knob sub−assembly.
Remove the O/D main switch.
Remove the No. 2 slide cover.
Remove the shift lever stop pin, shift lever knob button,
shift lever knob button guide and compression spring.
REMOVE UPPER POSITION INDICATOR HOUSING
Remove the upper position indicator housing.
Remove the control position indicator plate.
Remove the 4 slide covers from the lower position indica-
tor housing.
REMOVE LOWER POSITION INDICATOR HOUSING
Remove the indicator lamp wire sub−assembly.
Remove the 4 screws and lower position indicator hous-
ing.
Remove the bulb cap and bulb from the indicator lamp
wire sub−assembly.
Remove the screw and indicator lamp wire sub−assem-
bly.
Remove the shift lock release button and spring.
1855
AX−23
AX0L8−02

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents