Toyota Celica 2005 Repair Manual page 1842

Hide thumbs Also See for Celica 2005:
Table of Contents

Advertisement

2005 CELICA (RM1131U)
AUTOMATIC TRANSAXLE (U240E)
(d)
D05913
(e)
D05912
5.
6.
Check that the engine can be started with the shift lever only in
the N or P position, but not in other position.
If the engine can not be stated not as started above, carry out
the adjustment procedure (See page DI−669).
7.
8.
D05911
PARK/NEUTRAL POSITION (PNP) SWITCH
Install the control shift lever with the nut.
Torque: 13 N·m (130 kgf·cm, 9 ft·lbf)
Connect the control cable to the control shaft.
Torque: 12 N·m (120 kgf·cm, 9 ft·lbf)
CONNECT PARK/NEUTRAL POSITION SWITCH CON-
NECTOR
CHECK PARK/NEUTRAL POSITION OPERATION
INSTALL AIR CLEANER ASSEMBLY
TEST DRIVE VEHICLE
1841
AX−9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents