Toyota Celica 2005 Repair Manual page 2065

Hide thumbs Also See for Celica 2005:
Table of Contents

Advertisement

SST
2005 CELICA (RM1131U)
STEERING
TILT STEERING COLUMN
REASSEMBLY
NOTICE:
When using a vise, do not overtighten it.
1.
COAT PARTS INDICATED BY ARROWS WITH MOLYB-
DENUM DISULFIDE LITHIUM BASE GREASE
(See page SR−11)
2.
INSTALL MAIN SHAFT ASSEMBLY
(a)
Using a snap ring expander, install a new snap ring on the
lower side.
(b)
Install the main shaft assembly.
(c)
Using a snap ring expander, install a new snap ring on the
upper side.
3.
INSTALL MAIN SHAFT BUSHING
(a)
Coat a new bushing with molybdenum disulfide lithium
base grease.
(b)
Using SST and a hammer, tap in the main shaft bushing.
SST
09608−04031
4.
INSTALL BREAK AWAY BRACKET AND TILT LEVER
(a)
Install the No. 2 support collar to the break away bracket.
(b)
Install the break away bracket, tilt lever lock bolt, stopper
and tilt lever.
F08496
HINT:
Align the holes in the column tube with the projections of the tilt
lever lock bolt and stopper.
(c)
Install the adjusting nut by rotating it counterclockwise in
the specified torque so that the locking load (load applied
to when a knob is operated) of the tilt lever will be 38 − 82
N (3.9 − 8.4 kgf, 8.5 − 18.4 lbf).
Torque: 9 N·m − 14 N·m (90 kgf·cm − 145 kgf·cm, 80
in.·lbf − 10 ft·lbf)
F08877
2064
SR−19
SR0VO−04

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents