CH−16
2005 CELICA (RM1131U)
CHARGING
5.
INSTALL VOLTAGE REGULATOR AND BRUSH
HOLDER
(a)
Place the seal plate on the rectifier end frame.
B09166
(b)
Place the voltage regulator and brush holder on the recti-
Upward
fier end frame.
NOTICE:
Be careful of the holder installation direction.
(c)
Install the 5 screws.
Torque: 2.0 N·m (20 kgf·cm, 18 in.·lbf)
B09164
(d)
Place the brush holder cover on the brush holder.
B09167
6.
INSTALL REAR END COVER
(a)
Install the end cover and plate terminal with the bolt and
3 nuts.
Torque:
Nut 4.4 N·m (45 kgf·cm, 39 in.·lbf)
Bolt 3.9 N·m (39 kgf·cm, 35 in.·lbf)
(b)
Install the terminal insulator with the nut.
Torque: 4.1 N·m (42 kgf·cm, 36 in.·lbf)
7.
CHECK THAT ROTOR ROTATES SMOOTHLY
B07732
1698
−
GENERATOR