Tensioning Rail - SSANGYONG Rexton Y200 Manual

Hide thumbs Also See for Rexton Y200:
Table of Contents

Advertisement

1B1-88 M162 ENGINE MECHANICAL
Preceding Work : Removal of timing gear case cover

1 Tensioning Rail

2 Plastic Guide
TENSIONING RAIL
3 Tensioning Rail Pin
4 Guide Rail
Removal & Installation Procedure
1. Put the assembly mark at the camshaft sprocket
and the timing chain with the paint (arrow).
2. Remove the exhaust camshaft sprocket.
3. Remove the tensioning rail (1) from the tensioning
rail pin (3).
Notice:
Replace the plastic guide (2) if it is damaged.
For installation, exactly align the plastic guide
(2) with the tensioning rail (1).
4. Installation should follow the removal procedure
in the reverse order.
5. Check the camshaft timing position.
YAD1B2H0
SSANGYONG Y200

Advertisement

Table of Contents
loading

Table of Contents