SSANGYONG Rexton Y200 Manual page 309

Hide thumbs Also See for Rexton Y200:
Table of Contents

Advertisement

SSANGYONG Y200
DIESEL ENGINE MECHANICAL 1B3-41
14. Coat the camshaft with oil and install the camshaft
on the cylinder head to be TDC mark(arrow)
upward.
15. Measure the axial end play of the camshaft.
Installation Notice
If out of standard, adjust it with the proper
thickness of locking washer.
YAD1BCN0
16. Install the bearing caps on the camshaft according
to the number on the caps.
YAD1BCP0
17. Tighten the bearing cap bolts according to the
numerical sequence.
Installation Notice
Tightening Torque
Tighten the No. 1 bolts (light arrow) first and then
tighten the No. 2 bolts (dark arrow) stage by stage.
YAD1BCQ0
18. Position the camshaft on marking and install the
camshaft sprocket.
Notice: Align the alignment marks on the chain
and sprocket.
YAD1BC30
End Play
0.06 ~ 0.21 mm
25 N•m (18 lb-ft)

Advertisement

Table of Contents
loading

Table of Contents