SSANGYONG Rexton Y200 Manual page 133

Hide thumbs Also See for Rexton Y200:
Table of Contents

Advertisement

1B1-92 M162 ENGINE MECHANICAL
Tools Required
615 589 01 33 00 Crankshaft Sprocker Puller
Removal & Installation Procedure
1. Put the assembly mark at the crankshaft sprocket
(4) and the timing chain (10) with the paint (arrow).
Notice: Align the assembly marks on cranshaft
sprocket and timing chain. Also, align the
assembly marks on camshaft sprocket and timing
chain when installing.
2. Unscrew the bolt (6) and remove the oil pump
sprocket (7) from the oil pump.
YAD1B2N0
Installation Notice
Tightening Torque
3. Remove the oil pump roller chain (9).
4. Remove the oil pump chain tensioner (1), oil pump
chain bushing (2), and the oil pump chain spring
(3).
5. Remove the crankshaft sprocket (4) using the
crankshaft sprocket puller 615 589 01 33 00.
Notice:
Make sure not to lose the crankshaft pulley key
(5) when removing.
Install the crankshaft sprocket (4) after warming
it up.
6. Installation should follow the removal procedure
in the reverse order.
YAA1C850
29 - 35 N•m
(21 - 26 lb-ft)
SSANGYONG Y200

Advertisement

Table of Contents
loading

Table of Contents