SSANGYONG Rexton Y200 Manual page 348

Hide thumbs Also See for Rexton Y200:
Table of Contents

Advertisement

1B3-80 DIESEL ENGINE MECHANICAL
Installation Procedure
1. Put the same alignment mark on the new
crankshaft sprocket as in the old sprocket.
Notice: Check the timing chain, camshaft
sprocket, injection pump timing sprocket, oil pump
chain and oil pump sprocket for wear and replace
if necessary.
YAD1BFB0
2. Install the new crankshaft sprocket (12) by using
a drift 116 589 07 15 00 (21).
Notice: Align the groove of sprocket and woodruff
key (arrow) exactly.
YAD1BFC0
3. Fit the timing chain (4) on the crankshaft sprocket
(12).
Notice: Align the alignment marks (arrow) on the
chain and sprocket.
YAD1BF90
4. Install the camshaft sprocket (3).
Installation Notice
Tightening Torque
Pay attention on the alignment marks and dowel
pin (arrow).
YAD1BC20
25 N•m (18 lb-ft)+ 90°
SSANGYONG Y200

Advertisement

Table of Contents
loading

Table of Contents