Poly V-Belt - SSANGYONG Rexton Y200 Manual

Hide thumbs Also See for Rexton Y200:
Table of Contents

Advertisement

1B2-16 M161 ENGINE MECHANICAL
Preceding Work:
Removal of cooling fan
1 Poly V-Belt (2,155 mm)
2 Belt Tensioning Pulley
POLY V - BELT
3 Belt Tensioner
Removal & Installation Procedure
1. Release the belt tension by turning the stud on
the cap with 12 sided wrench or spanner
counterclock-wise.
2. Remove the poly v-belt.
Notice: Check the belt for damage and tensioning
pulley bearing point for wear and replace them if
necessary.
3. Install the belt after prying the tensioning pulley.
YAD1A130
YAD1B5P0
SSANGYONG Y200

Advertisement

Table of Contents
loading

Table of Contents