SSANGYONG Rexton Y200 Manual page 70

Hide thumbs Also See for Rexton Y200:
Table of Contents

Advertisement

SSANGYONG Y200
M162 ENGINE MECHANICAL 1B1-29
Tools Required
116 589 01 34 00 Threaded Pin
116 589 20 33 00 Sliding Hammer
617 589 00 10 00 Allen Wrench Socket
Removal & Installation Procedure
1. Rotate the crankshaft so that the piston of number
1 cylinder is at TDC.
Notice: Rotate the crankshaft in the normal engine
direction.
2. Put the alignment marks (arrows) on the timing
YAD1B590
chain and camshaft sprocket.
3. Drain the coolant from the crankcase.
4. Remove the three flange bolts in the exhaust
camshaft sprocket.
Installation Notice
Tightening Torque
Do not reuse the removed bolts.
YAD1B600
5. Separate the chain from the camshaft sprockrt.
Notice: Be careful not to drop the chain into the
timing case.
YAD1B610
1st step: 18 - 22 N•m
(13 - 16 lb-ft)
2nd step: 90° ± 5°

Advertisement

Table of Contents
loading

Table of Contents