SSANGYONG Rexton Y200 Manual page 126

Hide thumbs Also See for Rexton Y200:
Table of Contents

Advertisement

SSANGYONG Y200
M162 ENGINE MECHANICAL 1B1-85
6. Remove the outer plate (7) with the screw driver
and remove the link.
YAD1B1Z0
7. Connect the new timing chain (2) to the used
timing chain (3) with the link (5), center plate (6,
thickness 1.6 mm), and the outer plate (7).
8. Rotate the crankshaft in the direction if engine
revolution by pressing the new timing chain
against the exhaust camshaft sprocket to prevent
it to be tangled.
Notice: Be sure to remove the wedge before
cranking the engine.
9. Take out the used timing chain out from the chain
housing.
10. Connect both separators of the new timing chain
YAD1B2A0
with the link (5) and the center plate (6).
11. Install the jaw (a) and the thrust piece (b) to the
assembly tool as shown in the figures.
YAD1B2B0
YAD1B2C0

Advertisement

Table of Contents
loading

Table of Contents