SSANGYONG Rexton Y200 Manual page 366

Hide thumbs Also See for Rexton Y200:
Table of Contents

Advertisement

1B3-98 DIESEL ENGINE MECHANICAL
6. Remove the spring retainer (3) and spring (4).
7. Check the valve spring and replace if necessary.
8. Insert valve spring (4) with the color coding (arrow)
facing down and insert valve spring Retainer (3).
YAD1BGH0
9. By press the spring retainer (3) with press lever
667 589 00 31 00 (9), install the valve cotters with
magnetic finger 116 589 06 63 00 (10).
YAD1BGG0
10. Remove the supporting bar 667 589 02 63 00.
11. Remove the holding wheel 603 589 01 40 00 (7)
from the timing chain (5).
YAD1BGE0
13. Coat the valve tappet with oil and install it with
magnetic bar 102 589 03 40 00.
YAD1BG40
SSANGYONG Y200

Advertisement

Table of Contents
loading

Table of Contents