M161 ENGINE MECHANICAL 1B2-31
Tools Required
116 589 20 33 00 Sliding Hammer
116 589 01 34 00 Threaded Pin
Removal & Installation Procedure
1. Remove the power steering belt pulley and A/C
compressor bracket.
2. Remove the oil line from power steering pump.
3. Rotate the crankshaft so that the piston of number,
cylinder is at ATDC 20 ° .
YAD1B6D0
4. Put the alignment marks (arrows) on the timing
chain and camshaft sprocket.
5. Remove the chain tensioner.
Installation Notice
Tightening Torque
6. Remove the intake and exhaust camshaft sprocket
(remove the camshaft adjuster assembly in E23
engine).
Installation Notice
YAD1B6F0
Tightening Torque
Notice: The flange bolt is designed to be used
only once, so always replace with new one.
7. Remove the guide rail pin using the sliding hammer
116 589 20 33 00 (02) and the threaded pin 116
589 01 34 00 (03).
Notice: Apply the sealant on guide rail pin when
installation.
YAD1B6J0
72 - 88 N•m
(53 - 65 lb-ft)
1st step: 18 - 22 N•m
(13 - 16 lb-ft)
2nd step: 60° ± 5°