1B3-110 DIESEL ENGINE MECHANICAL
Tools Required
115 589 34 63 00 Mounting Device
345 589 00 63 00 Super Cooling Box
Removal Procedure
1. Measure dimension 'A'.
2. Clamp the cylinder head with clamping device.
YAD1BH40
3. Cut groove into the valve seat ring so that
dimension 'C' is approx. 2 mm and dimension
'E' is approx. 6 mm.
YAD1BH50
4. Remove the cylinder head from the clamping
device and place it onto wooden blocks.
5. Remove the valve guide (3) by using a drift
(Intake: 8 mm, Exhaust: 9 mm).
YAD1BH60
6. Insert the tensioning head (4) and extracted
wedges(arrow) by turning the bolt (5).
Notice: Carefully tighten the bolt (5) otherwise the
valve seat ring in the cylinder head will be
excessively tensioned.
7. Lock the bolt (5) with nut (6).
YAD1BH70
Limit
142.5 mm
SSANGYONG Y200