SSANGYONG Rexton Y200 Manual page 389

Hide thumbs Also See for Rexton Y200:
Table of Contents

Advertisement

1B3-120 DIESEL ENGINE MECHANICAL
Tools Required
000 589 58 43 00 Chain Assembling Device
Replacement Procedure
1. Cover over the chain box with cleaning rag and
grind off both chain pins (arrow) at a chain link (1)
of the timing chain.
YAD1BHL0
2. Remove the outer plate (4) and chain link (1).
Notice: Ensure that the ends of the timing chain
do not drop into the chain box.
YAD1BHM0
3. Loosen the chain tension with approx. 4 turns.
4. Connect the new timing chain (arrow) with chain
link (1) to the old timing chain (2).
YAD1BHN0
5. By rotating the crankshaft in the of engine rotation,
pull out the old timing chain with installing the new
timing chain.
6. Remove the old timing chain and hold the ends of
the new timing chain to camshaft sprocket (3) with
wire (arrow).
YAD1BHP0
SSANGYONG Y200

Advertisement

Table of Contents
loading

Table of Contents