SSANGYONG Y200
DIESEL ENGINE MECHANICAL 1B3-155
Tools Required
102 589 00 15 00 Drift
102 589 12 15 00 Drift
Replacement Procedure
1. Completely drain the coolant.
2. Remove any parts which impede access.
(Example : transmission, injection pump)
3. Place the screwdriver to the deepdrawn edge of
the core plug and pull forward and then rotate 90°.
YAD1B3Z0
4. Pull out the core plug with pliers.
YAD1B4B0
5. Thoroughly clean the sealing surface and apply
Loctite 241.
6. Install the new core plug by using a drift.
7. Install the removed parts and fill the coolant.
Notice: The adhesive must be allowed to harden
for about 45 minutes before filling of coolant.
8. Warm up the engine and check the coolant for
leaks.
YAD1BK80