SSANGYONG Rexton Y200 Manual page 654

Hide thumbs Also See for Rexton Y200:
Table of Contents

Advertisement

1F3-30 DIESEL ENGINE CONTROLS
5. Opening pressure test :
Open the valve (3) and slowly operate the hand
lever at tester (approx. 1 stroke / second) and
measure opening pressure.
Difference Between Nozzles
Notice: If out of standard, repair the injection
nozzle.
6. Leak test
YAD1FBC0
Slowly operate the hand lever at the tester until
get a pressure of approx. 90 bar. Maintain this
pressure for more than 20 seconds and within this
period no drop of fuel should build up at the nozzle
tip.
New Nozzle
Used Nozzle
135 - 143 bar
Min. 120 bar
Max. 5 bar
SSANGYONG Y200

Advertisement

Table of Contents
loading

Table of Contents