Valve Stem Seal - SSANGYONG Rexton Y200 Manual

Hide thumbs Also See for Rexton Y200:
Table of Contents

Advertisement

1B1-78 M162 ENGINE MECHANICAL
Preceding Work : Removal of valve spring
1 Drift 119 589 00 43 00

2 Valve Stem Seal

VALVE STEM SEAL
3 Protective Sleeve
Tools Required
119 589 00 43 00 Drift
Replacement Procedure
1. Remove the valve stem seal (2) using the pliers.
Notice: Check the valve stem seal for damage and
replace if necessary.
2. Coat the valve stem seal with oil and assemble it
with the protective sleeve.
3. Insert the valve stem seal by pressing it with the
drift 119 589 00 43 00.
YAD1B1M0
YAD1B1K0
SSANGYONG Y200

Advertisement

Table of Contents
loading

Table of Contents