3A-18 FRONT AXLE
VACUUM LINE
Removal/Installation
1. Be careful not to change the direction of valve
when connecting the check valve(11) with each
hose.
YAD3A310
2. Adjust the clearance between the retainer ring (5)
and locking hub (7) to the normal value by using
the appropriate shim (6).
Notice: Shim thickness 0.1, 0.2, 0.3, 0.5, 1.0 mm
3. Tighten the auto locking hub cap bolt to the
specified torque and order.
Installation Notice
Tightening Torque
YAD3A320
Normal
MAX. 0.2 mm
50 - 60 N•m
(37 - 44 lb-ft)
SSANGYONG Y200