Configuring Ucp With Espr - Allied Telesis SwitchBlade x3100 Series Manual

Release 14.2 - issue 2
Table of Contents

Advertisement

Introduction
= Physical Link
= Control VLAN (1200)
= Data VLAN (600)
UP
10.1
600
1200
10.2
DOWN
EPSR_UCP_Interop

4.8.5 Configuring UCP with ESPR

Table 4-24
shows the steps involved in configuring the PRIMARYUPSTREAM node for
4-180
Software Reference for SwitchBlade x3100 Series Switches (Layer Two Switching)
10.0
DOWN
A
1200
1
D = Devices
A
1
4
Master
Node
PP
2
1200
C
DOWN
FIGURE 4-24
Primary
Upstream
Interface
DOWN
600
= Links
SP
3
600
UP
UCP and EPSR - Fault Recovery
Configuring UCP with ESPR
Upstream Network
SBx900
Secondary
Upstream
Interface
4
UP
11.2
600
1200
10.1
DOWN
UCP Protocol changes
direction of interfaces
to match new topology
Figure
4-23.

Advertisement

Table of Contents
loading

Table of Contents