SSANGYONG Rexton Y200 Manual page 1048

Hide thumbs Also See for Rexton Y200:
Table of Contents

Advertisement

5A-180 AUTOMATIC TRANSMISSION
Front Band Assembly
1. Install the reaction anchor strut to the case.
2. Check the band for all cracks or damage along its
lining and metal backing.
3. Position the strut retainers on the band.
KAA5A0E0
4. Install the front band into the transmission case,
ensuring that it is properly seated in place.
Notice: If fitting a new band, soak the band in
automatic transmission fluid for a minimum of 5
minutes prior to assembly.
5. Position the reaction strut in its retaining clip and
engage it with the band and anchor strut.
6. Position the apply strut in its retaining clip and
engage it with the band and the servo piston rod.
KAA5A550
C2/C4 Clutch Assembly
Tools Required
0555-336259
0555-336260
Notice:
Check pistons for cracks.
Do not mix the clutch piston return springs.
Ensure that the snap rings are fitted correctly.
1. Check the feed orifices in the cylinder bore are clear
of obstructions.
2. Check the C2 piston bleed orifices are clear of
obstructions.
3. Lubricate the 'O' rings with Automatic Transmission
Fluid (ATF)
4. Fit the small 'O' ring onto the inner groove, and
the large 'O' ring onto the outer groove of the piston.
Notice: 'O' rings must not be twisted in the grooves.
KAA5A0F0
Clutch Spring Compressor
Clutch Pack Clearance Kit
SSANGYONG Y200

Advertisement

Table of Contents
loading

Table of Contents