SSANGYONG Rexton Y200 Manual page 1121

Hide thumbs Also See for Rexton Y200:
Table of Contents

Advertisement

SSANGYONG Y200
MANUAL TRANSMISSION 5B-35
6. Remove the 2nd speed gear, bearing and spacer.
YAD5B880
7. Using a screwdriver, remove the spiral retaining
ring.
YAD5B890
8. Remove the thrust washer and three-piece 2nd
speed blocking ring assembly.
YAD5B900
9. For correct reassembly, place an alignment mark
on the 1-2 synchronizer hub and sleeve.
10. Remove the 1-2 synchronizer sleeve from the hub
with following parts :
The anti-rattle ball and spring.
The three keys.
One of the 3 springs.
YAD5B910

Advertisement

Table of Contents
loading

Table of Contents