5B-34 MANUAL TRANSMISSION
27. Remove the fill plug.
28. Remove the transmission from the holding fixture
and install it to the vehicle.
29. Clean the sealing surface of the shift control lever.
30. Install the control cables to the shift lever.
MAIN SHAFT
Disassembly Procedure
1. For correct reassemble, place an alignment mark
on the 3-4 Synchronizer hub and sleeve.
2. Using a hydraulic press and puller plate, remove
the 3-4 Synchronizer assembly and the 3rd speed
gear.
YAD5B850
3. Remove the 3rd speed gear bearing and spacer.
YAD5B860
4. Using a snap ring pliers, remove the 2nd speed
gear snap ring.
5. Remove the 2nd speed gear thrust washer.
YAD5B870
SSANGYONG Y200