ABB IRB 1300 Product Manual page 630

Hide thumbs Also See for IRB 1300:
Table of Contents

Advertisement

5 Repair
5.7.2 Replacing the axis-2 gearbox
Continued
3
Reconnecting the axis-6 motor connectors
1
2
3
Refitting the process hub
1
Continues on next page
630
Action
Reconnect the connectors.
FB5
MP5
Tip
See the number markings on the connectors for
help to find the corresponding connector.
Action
For robots with protection type Clean Room:
Clean the joints that have been opened and wipe
the parts free from particles with spirit on a lint
free.
Insert the male header of the motor connectors
to the connector plate.
Reconnect the connectors.
FB6
MP6
Tip
See the number markings on the connectors for
help to find the corresponding connector.
Action
For robots with protection type Clean Room:
Clean the joints that have been opened and wipe
the parts free from particles with spirit on a lint
free.
© Copyright 2020-2022 ABB. All rights reserved.
Note
xx2000001534
Note
xx2000001533
xx2000001532
Note
Product manual - IRB 1300
3HAC070390-001 Revision: G

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents