ABB IRB 1300 Product Manual page 416

Hide thumbs Also See for IRB 1300:
Table of Contents

Advertisement

5 Repair
5.5.3 Replacing the tubular and tilt unit
Continued
Required tools and equipment
Equipment
Standard toolkit
Calibration toolbox, Axis Calibra-
tion
24 VDC power supply
Sonic tension meter
Tension adjustment tool for axis-4
timing belt
Dynamometer
Special toolkit for IP67/Clean
Room/Foundry Plus robots
Required consumables
Consumable
Cable straps
Grease
Flange sealant
Cleaning agent
Removing the tubular and tilt unit (IRB 1300-11/0.9 and IRB 1300-10/1.15)
Use these procedures to remove the tubular and tilt unit for IRB 1300-11/0.9 and
IRB 1300-10/1.15.
Preparations before removing the tubular and tilt unit
1
Continues on next page
416
Action
Decide which calibration routine to use, and take
actions accordingly prior to beginning the repair
procedure.
© Copyright 2020-2022 ABB. All rights reserved.
Article number
Note
-
Content is defined in section
Standard toolkit on page
3HAC074119-001
Delivered as a set of calibration
tools.
Required if Axis Calibration is the
valid calibration method for the
robot.
-
Used to release the motor brakes.
-
Used for measuring the timing
belt tension.
-
Included in special toolkit
3HAC076396-001.
-
Used for measuring the timing
belt tension.
3HAC078203-001
Used with protection class IP67,
and protection types Clean Room
and Foundry Plus.
Used for the press-fitting of radial
sealings. Includes five sets of ra-
dial sealing assembly tool for
axes 1 to 4 and axis 6.
Article number
Note
-
3HAC029132-001
FM 222
-
Loctite 574
-
Isopropanol
Note
759.
Product manual - IRB 1300
3HAC070390-001 Revision: G

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents