ABB IRB 1300 Product Manual page 574

Hide thumbs Also See for IRB 1300:
Table of Contents

Advertisement

5 Repair
5.6.6 Replacing the axis-6 motor
Continued
3
Securing the cable package in the tubular
1
2
3
Refitting the process hub
1
Continues on next page
574
Action
Reconnect the connectors.
FB6
MP6
Tip
See the number markings on the connectors for
help to find the corresponding connector.
Action
For robots with protection type Clean Room:
Clean the joints that have been opened and wipe
the parts free from particles with spirit on a lint
free.
Refit the connector plate.
Route and secure the cabling with a cable strap.
CAUTION
Correct cable routing is highly important.
If the cables are routed and secured incorrectly
the cables can be damaged.
Action
For robots with protection type Clean Room:
Clean the joints that have been opened and wipe
the parts free from particles with spirit on a lint
free.
© Copyright 2020-2022 ABB. All rights reserved.
Note
xx2000001532
Note
Screw: M3x8 12.9 Lafre
2C2B/FC6.9 (2 pcs)
Tightening torque: 1.3 Nm
xx2100001484
xx2100001483
Note
Product manual - IRB 1300
3HAC070390-001 Revision: G

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents