ABB IRB 1300 Product Manual page 603

Hide thumbs Also See for IRB 1300:
Table of Contents

Advertisement

3
4
Pulling out the cable package
1
2
3
Product manual - IRB 1300
3HAC070390-001 Revision: G
Action
Remove the axis-2 cable protector.
Remove the cable brackets from the swing first
and then from the cable package.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
CAUTION
For robots with protection type Clean Room
Always cut the paint with a knife and grind the
paint edge when disassembling parts of the robot!
See
Cut the paint or surface on the robot before
replacing parts on page
145.
Wrap the connectors with the masking tape.
© Copyright 2020-2022 ABB. All rights reserved.
5.7.2 Replacing the axis-2 gearbox
Note
xx2000001556
xx2000001557
xx2100001466
Note
Continues on next page
5 Repair
Continued
603

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents