ABB IRB 1300 Product Manual page 487

Hide thumbs Also See for IRB 1300:
Table of Contents

Advertisement

Replacing the axis-3 mechanical stops
1
2
3
4
5
Product manual - IRB 1300
3HAC070390-001 Revision: G
Action
Jog the robot to a position where the mechanical
stops are most easily accessed.
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the safeguarded
space.
Remove the mechanical stops.
Discard the old stops and refit with new ones.
Apply a little Loctite 243 to the screws.
Note
If there is locking liquid residues on the screw,
please clean it before refitting. Remove residual
locking liquid after refitting.
© Copyright 2020-2022 ABB. All rights reserved.
5.5.4 Replacing the axis-3 mechanical stops
Note
For IRB 1300-11/0.9, IRB 1300-
7/1.4 and IRB 1300-12/1.4
xx2000000507
For IRB 1300-10/1.15
xx2000000508
For IRB 1300-11/0.9, IRB 1300-
7/1.4 and IRB 1300-12/1.4
Mechanical stop, block A:
3HAC065651-001 (2 pcs)
For IRB 1300-10/1.15
Mechanical stop, block A:
3HAC065651-001 (1 pcs)
Mechanical stop, block B:
3HAC065671-001 (1 pcs)
Continues on next page
5 Repair
Continued
487

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents