ABB IRB 1300 Product Manual page 252

Hide thumbs Also See for IRB 1300:
Table of Contents

Advertisement

5 Repair
5.4.2 Replacing the swing
Continued
Separating the cable package from the housing
1
2
3
Disconnecting the axis-2 and -3 motor connectors
1
2
3
Continues on next page
252
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
CAUTION
For robots with protection type Clean Room
Always cut the paint with a knife and grind the
paint edge when disassembling parts of the robot!
See
Cut the paint or surface on the robot before
replacing parts on page
145.
Remove the axis-4 cable protector.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
CAUTION
For robots with protection type Clean Room
Always cut the paint with a knife and grind the
paint edge when disassembling parts of the robot!
See
Cut the paint or surface on the robot before
replacing parts on page
145.
Remove the connector plate.
CAUTION
Be aware of the cablings that are attached to the
connector plate! The connector plate cannot be
removed completely until the connectors are re-
move from the plate, as shown in following step.
© Copyright 2020-2022 ABB. All rights reserved.
Note
xx2000001546
Note
xx2000001548
Product manual - IRB 1300
3HAC070390-001 Revision: G

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents