ABB IRB 1300 Product Manual page 421

Hide thumbs Also See for IRB 1300:
Table of Contents

Advertisement

3
4
Separating the cable package from the tubular
1
2
3
Product manual - IRB 1300
3HAC070390-001 Revision: G
Action
For robots with CP/CS cabling
Disconnect the connectors.
J1.C1
J1.C3
Tip
Take photos of the connector and cable position
before disconnecting them, to have as a reference
when reconnecting.
Snap loose and remove the male head of the
connectors from the connector plate.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
CAUTION
For robots with protection type Clean Room
Always cut the paint with a knife and grind the
paint edge when disassembling parts of the robot!
See
Cut the paint or surface on the robot before
replacing parts on page
145.
Remove the first semicircular bracket that fixes
the cable package.
© Copyright 2020-2022 ABB. All rights reserved.
5.5.3 Replacing the tubular and tilt unit
Note
xx2000001536
xx2000001537
Note
xx2000001748
Continues on next page
5 Repair
Continued
421

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents